-

St Lawrence Denton: Heritage conservation case study
Work highlight
We have overseen external repairs programmes since 1998 as well as internal alterations to this grade 2 listed church.
Read More about St Lawrence Denton: Heritage conservation case study -

Cliff Park: Special needs case study
Work highlight
This project involved the conversion of an existing dormer bungalow for our client.
Read More about Cliff Park: Special needs case study -

Sandhill Lane: Special needs case study
Work highlight
This new build private dwelling was designed for a client with special needs.
Read More about Sandhill Lane: Special needs case study -

Bolton Road Methodist Church: Sustainability case study
Work highlight
The brief for Bolton Road Methodist Church was to include a sports hall; counselling rooms; nursery school; meeting rooms and w…
Read More about Bolton Road Methodist Church: Sustainability case study -

Linacre Mission: Community case study
Work highlight
Linacre Mission is a Grade II Listed Building originally opened in 1905 to serve the local community of Litherland. We were tas…
Read More about Linacre Mission: Community case study -

Chorley Methodist Church: Churches case study
Work highlight
The brief for Chorley Methodist Church required a glazed, welcoming entrance that provided level access into the church.
Read More about Chorley Methodist Church: Churches case study -

Holland’s Pies: Commercial-industrial case study
Work highlight
We have a long history of working with Holland’s Pies, developing their headquarters and bakery in Baxenden, Lancashire.
Read More about Holland’s Pies: Commercial-industrial case study -

Sheffield Hallam University: Education case study
Work highlight
We advised on development to the Sheffield Hallam University.
Read More about Sheffield Hallam University: Education case study -

Manchester Town Hall: Heritage conservation case study
Work highlight
We were proud to assist the lead architects for the Our Town Hall project.
Read More about Manchester Town Hall: Heritage conservation case study -

St Peter in the Forest: Heritage conservation case study
Work highlight
We acted as conservation architects and advisors on the rebuilding works to this grade 2 Victorian Church to the NE of London.
Read More about St Peter in the Forest: Heritage conservation case study